• Long Term Development Statements (North and South)

    Our Long Term Development Statements for both of Scottish and Southern Electricity Networks regions include information for anyone connecting to our distribution system at extra-high voltage (EHV) level (including HV busbar of primary substations). It is designed to help to identify and evaluate opportunities for entering into arrangements with us relating to the use of a system or connection.
  • Active Network Management - Orkney and Isle of Wight

    In areas where there are several, complex thermal constraints affecting a number of customers over a long period of time, full ANM systems will be implemented, where it is technically viable. An ANM system continually monitors all the constraints on an area of the network, in real-time, and allocates the maximum amount of capacity available to customers in that area based on the date their connection was accepted.
  • Network Rating and Loading Information

    We have compiled loading and maximum demand data for individual feeders and substations. This data has been prepared for both Scottish and Southern Electricity Networks regions and will give you information about the local network to allow the analysis required to ensure a safe and secure supply when self-identifying POCs. (Please note that you will be asked to register your e-mail and a password to view network rating and loading information on our secure website).

Network Development Plan Consultation

Our Network Development Plan (NDP) provides interested parties with information out to 2034 regarding the likely network capacity based on proposed network development in both our SEPD and SHEPD licence areas. The NDP builds on the Distribution Future Energy Scenarios (DFES), considering future system needs across multiple scenarios out to 2050, and highlights future flexibility opportunities and network interventions that we may develop and deliver in our licence areas.

The NDP is published as a collection of documents:

-       The NDP Methodology describing the end-to-end network planning process.

-       The Network Scenario Headroom Reports indicating where it is anticipated that there will be network capacity to accommodate future connections and where flexibility services may be required.

-       The Network Development Report providing information on key projects set for delivery in terms of new infrastructure to be installed and upcoming flexible services to be employed.

-       The NDP consultation document describing the consultation process and how to get involved.

We are consulting with stakeholders on our draft 2024 NDP. This consultation is open until 25 April 2024. Please see our consultation document, using the link below, which provides further detail on the consultation process and how to respond. We will also be providing an overview of the draft NDP on a dedicated webinar on 10th April.

 

2024 Draft Network Development Plan

2022 Network Development Plan

Generation Availability and Contracted Demand map

View our Generation Availability and Contracted demand map for both north and south. Our map provides an indication of the networks capability to connect large-scale developments to major substations. The heat map for both of our network regions provides Grid Supply Point (GSP) details, GSP and substation transformer ratings, Fault level information, and contracted and quoted generation projects at each GSP.
Preview image of our new map