Your browser does not support JavaScript or has it disabled. To enable full functionality of this site it is necessary to enable JavaScript.
  • Generation Availability Map

    Please click on any of the links below to be taken to the relevant map

    Generation Availability Map Shetland Map Scotland Map England Map
  • Please note that distribution network constraints may be caused by a number of issues such as thermal, fault level, voltage constraints. Other constraints can be caused by physical space limitations within SSEN licence areas or limitations imposed by the Transmission System Operator.

    Please note that the Constrained term at distribution level in our Central Southern England Generation Availability Map is assessed based on the addition of at least 5MVA synchronous generator resulting in SSEN network constraints. If you intend to apply for generator capacities below 5MVA you may well consider the constrained areas as well as unconstrained areas. 

    Our Innovation Team are looking at different ways to overcome distribution network thermal constraints, please view our current projects by clicking here. For any other queries please send an e-mail at commercial.contracts@sse.com

  • Heat Map

    User Guide

    Step 1:

    Use your mouse to roll over the Heat Map area you wish to view: Central Southern England, Northern Scotland or Shetland.

    Step 2:

    Click to bring up your Heat Map area.