  • Single or multiple generators with aggregate capacity of 50kW or less connected under G59/3 or G99

    Due to the constrained capacity available in some areas of the network, you may have to wait for the reinforcement to connect even where your proposed aggregate generation capacity is 50kW or less.

  • If the following statements are true then you must complete an application for the generation station prior to installation under this process.
    You intend to connect a generator which does not meet G83/2-1 or G98.
    Your generation station has an aggregate capacity of 50kW or less.

    You must notify us 15 days prior to commissioning as we may need to attend during these tests
    If you plan to install a generator up to 17kW (single phase) or 50kW (three phase) which does not conform to the G83/2-1 or G98 then you will need to consult the guide for connecting generation within ENA ER G59/3 or G99